![]() |
![]() |
#11 |
Goon Squad Leader
Join Date: Nov 2004
Location: Seattle
Posts: 27,063
|
Well Gollum, I'll tell ya.
I got eleven full length boards installed and the next board required some cutting. Specifically, I had to notch it to fit in under a post. I *did* notch it, but not quite enough. I needed to enlarge the notch, but by that time I was out of patience, energy, daylight, and gumption. Half a board it is. The following night only ten and a half boards, then Friday night, none.. I'd burned my candle all the way down. Saturday was a daylight working day but lots of rain, so I got stuff done, but minimal boards installed. I did buy another fifty or so. Those all had to be unloaded and trimmed to length and stacked. Today's work is measured in half decks. I have installed boards across half the deck. Pics later.
__________________
Be Just and Fear Not. |
![]() |
![]() |
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
|
|