The Cellar  

Go Back   The Cellar > Main > Creative Expression

Creative Expression Post your own works and chat about them

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 07-19-2013, 09:50 PM   #4
BigV
Goon Squad Leader
 
Join Date: Nov 2004
Location: Seattle
Posts: 27,063
We got a single board of bevel siding to replace four sections of siding that were pretty far gone. The vertical trim board missing from E's right at the edge of the front wall of the shed where he's working was replaced with new cedar on both sides of the front.
Name:  IMG_3235sm.jpg
Views: 6849
Size:  107.1 KB


Nearly done here. The last three courses of shingles were too long to fit on the roof and so we cut them down. Even the uppermost course was a little long and so we made the exposure of the next to top course four inches so we'd have more shingle to work with.
Name:  IMG_3237sm.jpg
Views: 7968
Size:  62.0 KB


Ridge boards on. You can see the shorter exposure on the upper courses. Not visible in this picture is the adjustment I made to the ridge board that was underneath. I cut a bevel along the length of the board so that when they overlap, it makes a less acute joint between the ridge boards.
Name:  IMG_3243sm.jpg
Views: 6541
Size:  69.7 KB


Victory pose!
Name:  IMG_3241sm.jpg
Views: 6534
Size:  72.0 KB
__________________
Be Just and Fear Not.
BigV is offline   Reply With Quote
 

Tags
diy


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

All times are GMT -5. The time now is 07:02 PM.


Powered by: vBulletin Version 3.8.1
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.