View Single Post
Old 05-16-2016, 09:37 AM   #85
glatt
 
Join Date: Jul 2003
Location: Arlington, VA
Posts: 27,717
While that frame is drying, I turn back to the top shaft mounting block. It needs a 1 inch hole for the shaft.

Name:  IMG_4661.JPG
Views: 257
Size:  75.0 KB

And it needs a hole for the tracking adjustment bolt. A T-nut too.

Name:  IMG_4662.JPG
Views: 234
Size:  78.9 KB

This is with a sample bolt installed. Turning the bolt will tilt the mount and the shaft in the mount and will adjust the tracking of the blade on the wheels.

Name:  IMG_4663.JPG
Views: 275
Size:  79.7 KB

The mount goes in the frame I just glued up. And the frame is held to the big saw body frame with a couple of L brackets. So I made those L brackets.

Name:  IMG_4664.JPG
Views: 233
Size:  83.1 KB
glatt is offline   Reply With Quote