ugh . . . three big projects and no time left for them . . . luckily I'm almost done . . .
but it's that big push to finish the last one that is so tough.
btw, the projects are:
one 13-15 page web site, with triangulated color and in depth content, all written in emacs, image maps, frames (BLEH!), table on damn near every page, non-working "form" (like click to submit), and basically loads of content, almost all of which must be original, oh and toss in a few java scripts, some embeded sound, and maybe a little flash (25% complete)
one 3-4 minute video, almost any subject, must be all original content (drawings, video, pictures, etc), full sound (90% complete)
one DVD menu, 30sec-1min intro movie, full special features menu (deleted scenes or the like, but must have 3 of them), fully animated (like every button has a rollover), full sound compiled in director and exported as an .exe(100% complete)
software packages:
director, flash, dreamweaver, premiere, photoshop, illustrator, soundforge, and acid . . . to name a few
thankfully the dvd does not use original content, acutally used Blackhawk Down as the movie. Also kinda funny that two of these are complete director projects, and I opened the package for the first time about 5 weeks ago . . . thankfully nothing I'm doing is lingo heavy
anyway . . . just venting